The road to Tusheti is still locked. Due to bad weather, the problem of moving was created on the Pshavela-Bath-Omalo highway. The land collapsed on a few sections, especially the 27th kilometer. Heavy equipment is mobilized at the site, which operates periodically in accordance with the weather. As for the citizens who were stuck in the disaster zone, the rescue service, along with other agencies, was safely pulled out of the valley.